KitLog pro

Powered By Kitlog Pro v2.0

Bennies RV12 Build Site
' style=
Date:  9-4-2010
Number of Hours:  5.00
Manual Reference:  VS
Brief Description:  VS Spar & Rib drill, countersink, flute & deburr

The Vertical Stabilizer spar match drilled to the lower and upper caps. Lower and upper caps seperated and excess material removed using hack saw, bench grinder. Realised I am missing the Vicson file - will have to get one.

Obviously I could not do this job on my own and Christiaan helped with Clecos as the drilling progressed. (1.5hr)

Match drilling complete, final drilling complete and countersinking complete where required. (2hr)

Countersunk VS ribs, nibbed (rounded cutting) rib ends and fluted the ribs to straiten it. (0.5)

Started dedurring and polishing of all spar parts. (1hr)
' style=

Starting Match Drilling

Starting Match Drilling

' style=

Christiaan helping with Cleclos

Christiaan helping with Cleclos

' style=

Fluting VS Ribs

Fluting VS Ribs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.