KitLog pro

Powered By Kitlog Pro v2.0

Bennies RV12 Build Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-29-2010
Number of Hours:  2.00
Manual Reference:  VS
Brief Description:  VS Hinge Assembly Drilled

This work session includes Steps 5 to 8 completef for the Hinge Assemblies of Section 6 - Vertical Stabilizer.

The hinge bearings did not fit into the spacer plate holes with all best effort. This was the case for both upper and lower plates. The holes were gently reamed by filing and scuffing to get a very tight fit of the bearings.

At this point all deburing is complete. Nest is Polish, Scuff, and Prime/Alodine to follow before rivetting to complete this hinge assembly.

Workshop completion and tool arrangement and set-up still happening in between.
' style=

Hinges ready for final drill

Hinges ready for final drill

' style=

Final drilled HInge Assemblies

Final drilled HInge Assemblies

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.