KitLog pro

Powered By Kitlog Pro v2.0

Bennies RV12 Build Site
' style=
Date:  12-29-2010
Number of Hours:  1.00
Manual Reference:  AST
Brief Description:  AST Rivetting

Re-adjusted the puller and cleaned and lubricated. Established a procedure for the time being: Pull rivet and hold trigger, insert next rivet in puller and push against table (too much pressure required to to this with rivet in AST) , release trigger and rivet is ready in tool and previous stem pushed back. Tapp it on the back to ensure this rivet stem is out in mantel and so that stem build up is not taking place. Insert rivet with puller and pull trigger when in position - this part goes quick!

Finsihen to before final closure for inpsection to be done firts.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.