Powered By Kitlog Pro v2.0
Bens RV-7
RV-7
All
2-21-2008
< Previous Log Entry
Next Log Entry >
Date:
2-21-2008
Number of Hours:
2.00
Manual Reference:
Brief Description:
Left Elevator
Continued final riveting on the left elevator. First I squeezed some blue RTV between the stiffeners, as directed, then clecoed and riveted the bottom side of the left elevator. I'm waiting on a new E-606PP elevator spar and hinge to finish though.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
23
43
Empennage
23
43
Copyright © 2001-2024 Matronics. All Rights Reserved.