Powered By Kitlog Pro v2.0
BRUCE'S WEB SITE
FA-5G
Empennage
9-26-2015
< Previous Log Entry
Next Log Entry >
Date:
9-26-2015
Number of Hours:
1.00
Manual Reference:
dwg 606
Brief Description:
Jig for fin rib 3
Still designing the jig as I go.
Drove sixteen very small nails into the jig base to form the curved outline, cut the heads off them with a Dremel, leaving them 6mm long.
Started experimenting with offset drilled circular swivelling clamps to for m the rib stock into shape.
Still unable to upload photos.
Awaiting the arrival of new re-chargeable lithium-ion-polymer batteries, with special charger for my digital camera.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
FA-5G Home
Category
# Logs
# Hours
All
33
64
Empennage
26
54
Engine
1
1
Miscellaneous
6
9
Copyright © 2001-2024 Matronics. All Rights Reserved.