KitLog pro

Powered By Kitlog Pro v2.0

BOB'S WEB SITE
' style=
Date:  8-25-2017
Number of Hours:  1.50
Manual Reference:  Section 40
Brief Description:  Completed left light fairing

I popped the right light fairing off and sanded the extra flox away , drilled the two middle holes to the rib and then filled a small gap with SuperFil.

Later, the ProSeal shipment arrived so I went back out to the hangar, mixed up a bunch, slathered it on the flange of the light fairing, clecoed and then riveted it to the wing closeout and rib. I used the Popsicle stick "tool" to make a little fillet.

There's nothing that's every going to be neat about ProSeal but it went OK.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.