KitLog pro

Powered By Kitlog Pro v2.0

Barnstormer Squadron
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-6-2013
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Gear Break down

1. Took off step
2. Scissor on left gear bolt frozen on bottom scissor. Soaked in bolt freeze tonight.
3. Extended left gear.
4. Removed bolts from left anxle.

Need new bolts and nuts including zirt fittings for the gear.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.