KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV7 Site
' style=
Date:  4-8-2010
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Prop Spinner

I sanded the epoxy ring inside the spinner until the fit was tight with the forward flange. I then set out the rivet pattern around the circumference of the spinner at the forward and rear flanges. Then I drilled the flanges for plate nuts, deburred and primed the flanges.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.