Added hard foam supports to the fuel and purge lines on the cabin floor. Riveted the instrument panel support structure to the fuselage. Screwed the instrument panel frame into place. Installed nut plates on the lower panel frame for attaching the engine control sub panel. Made a mockup of the engine control panel to evaluate control spacing.