After three months of no activity building I began to tackle the engine control rigging. I temporarily installed the exhaust system to insure clearance for the control cable runs. The mixture control arm had to be reoriented to allow for the proper control cable operation. I also studied the plans and assembled the swivel brackets for the mixture and throttle cable attachments.