KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV7 Site
' style=
Date:  3-13-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  CHT and various lines

I installed the CHT probes into fittings on each cylinder. I then went through the FWF kit from Van's and organized the various hoses and connectors. I installed the fuel line from the mechanical fuel pump to the fuel injection unit, then connected the oil line from the prop to the prop governor mounting.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.