KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV7 Site
' style=
Date:  7-16-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Checked Aileron Control Connections

I also installed the final lock nuts on the aileron bell crank controls in the wings. I had a couple of bolts installed finger tight until the final length of the push rods was determined. This was complete so the final installation and torqueing of the nuts was finished. I then marked these with orange torque seal.

The right wing bell crank also has the auto pilot servo attached, which is the added control rod shown in photo #2. These connections were rechecked and marked.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.