Powered By Kitlog Pro v2.0
Bobs RV7 Site
RV-7
Electrical
1-1-2005
< Previous Log Entry
Next Log Entry >
Date:
1-1-2005
Number of Hours:
3.50
Manual Reference:
Brief Description:
Wired the fuel pump and FF
Wired the AFP high pressure fuel pump and the fuel flow senson. Crimped the proper connectors and installed shrink wrap and ran the wires through the conduit up to the rear of the instrument panel.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
663
2286
Administrative
11
57
Avionics
18
66
Baffeling
46
178
Canopy
29
140
Cowling
37
136
Electrical
59
238
Empennage
45
140
Empennage / Elevator
15
39
Empennage / HS
16
47
Empennage / Rudder
18
54
Empennage / VS
5
21
Engine
19
36
Firewall Forward
74
241
Fuel System
7
24
Fuselage
30
92
Instrument panel
36
120
Interior
48
163
Landing gear & brake
35
118
Miscellaneous
19
42
Prop
7
27
Shop Supplies
3
14
Systems
26
106
Upholstery
1
4
Wings
59
183
Copyright © 2001-2024 Matronics. All Rights Reserved.