KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV7 Site
' style=
Date:  3-21-2002
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Drill and prime the elevator frame

Clecoed and drilled the elevator frame. Deburred, dimpled and primed the frame using the previous priming method.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.