KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV7 Site
' style=
Date:  12-28-2006
Number of Hours:  4.80
Manual Reference:  
Brief Description:  FAB and Trim Forward Floor and Cowl

More epoxy/glass work on the FAB to reshape and build-up the ducting. Trimmed the lower lip of the lower cowl to allow a better fit of the baffle floors. Also made and drilled the bracket where the side baffles fit together.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.