KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV7 Site
' style=
Date:  12-23-2005
Number of Hours:  6.20
Manual Reference:  
Brief Description:  AOA mounting

The balloon on the left fuel tank held it's pressure through the night and the tank passed the leak test. I then repeated the procedure on the right tank and will check it tomorrow. I decided to mount the AOA box on the instrument panel support, above the ACS box. I manufactured mounts from aluminum angle and drilled for nutplates. The drilling, deburring, dimpling and riveting of nutplates was next. Then I primed the mounts.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.