KitLog pro

Powered By Kitlog Pro v2.0

Bobs RV7 Site
' style=
Date:  1-5-2005
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Wiring conduits added

Began drilling for added wiring conduits below the baggage area floor. Drilled and added plastic bushings to run the strobe and ELT wiring forward.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.