KitLog pro

Powered By Kitlog Pro v2.0

Fosters Web Site
' style=
Date:  9-12-2011
Number of Hours:  1.30
Manual Reference:  
Brief Description:  Rudder Controls #4

Fall is coming, starting to cool down at nights and humidity is down to 40%!!! Got a good session in today.

+ Installed Rudder Cable Idler on the left side of the fuselage
+ Installed additional cable liinks on the Rudder Pedals (didn't realize each side got two)
+ Removed bolts for installtion of Rudder Cable Idler on the right side of the fuselage.

Access to the bolts for the idlers is less than ideal in the Gear Towers, but patience prevailed! One key tip I have to admit I stole from Brent Owens' builder site. I used a pancake drill to match-drill the Idler Brackets to the fuselage. This solution came after much head scratching and staring at my 90° drill...
' style=

This took patience, but results were good!

This took patience, but results were good!

' style=

The plans do not show this well, but each side gets two cable links,. This looks MUCH better!

The plans do not show this well, but each side gets two cable links,. This looks MUCH better!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.