Powered By Kitlog Pro v2.0
Chad's Challenger II Site
Challenger II Long Wing
Fuselage
5-21-2005
< Previous Log Entry
Next Log Entry >
Date:
5-21-2005
Number of Hours:
4.00
Manual Reference:
Brief Description:
Misc.
Cut out and finished the slot for the rear shoulder harness to pass through.
Installed the two curved 1/2"pieces of the high side rail option. These become the bottoms of the windshield.
Secured the fuel line to the root tube using an 8-32 rivnut and SS machine screw.
Installed the remote ELT on/reset buttons.
Fuel line routing
Remote ELT buttons
Curved windshield frame
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Challenger II Long Wing Home
Category
# Logs
# Hours
All
193
693
Avionics
9
19
Controls
4
15
Covering
31
133
Electrical
13
50
Empennage
7
20
Engine
15
43
Fuselage
42
155
Instruments
2
15
Miscellaneous
15
49
None
7
6
Paint
22
96
Wings
26
92
Copyright © 2001-2024 Matronics. All Rights Reserved.