Powered By Kitlog Pro v2.0
Chad's Challenger II Site
Challenger II Long Wing
Fuselage
5-15-2005
< Previous Log Entry
Next Log Entry >
Date:
5-15-2005
Number of Hours:
5.00
Manual Reference:
Brief Description:
High side rail modification
Cut out the wood block from yesterday on a scroll saw and sanded it to finish.
Notched out the bottom tube of the dorsal fin to position the block in. I will afix the block to the fin using JB Weld and add a support rib above it later.
Installed the high side rail modification.
Elevator horn carry-thru
High side rails
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Challenger II Long Wing Home
Category
# Logs
# Hours
All
193
693
Avionics
9
19
Controls
4
15
Covering
31
133
Electrical
13
50
Empennage
7
20
Engine
15
43
Fuselage
42
155
Instruments
2
15
Miscellaneous
15
49
None
7
6
Paint
22
96
Wings
26
92
Copyright © 2001-2024 Matronics. All Rights Reserved.