Powered By Kitlog Pro v2.0
Chad's Challenger II Site
Challenger II Long Wing
Fuselage
2-20-2005
< Previous Log Entry
Next Log Entry >
Date:
2-20-2005
Number of Hours:
3.00
Manual Reference:
Brief Description:
Vertical stabilizer and door frame
Installed vertical stabilizer.
Installed door frame.
Started fabricating the fabric attach plates (will not use the ones that came with the kit) that will be installed near the aileron bell crank area.
Startedon the flaperon control system.
Vertical stabilizer installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Challenger II Long Wing Home
Category
# Logs
# Hours
All
193
693
Avionics
9
19
Controls
4
15
Covering
31
133
Electrical
13
50
Empennage
7
20
Engine
15
43
Fuselage
42
155
Instruments
2
15
Miscellaneous
15
49
None
7
6
Paint
22
96
Wings
26
92
Copyright © 2001-2024 Matronics. All Rights Reserved.