Powered By Kitlog Pro v2.0
Chad's Challenger II Site
Challenger II Long Wing
All
11-25-2005
< Previous Log Entry
Next Log Entry >
Date:
11-25-2005
Number of Hours:
6.00
Manual Reference:
Brief Description:
Throttle cable installation, Mechanical fuel pump
Attached the Mikuni mechanical fuel pump usint a Stainless "L" bracket and AN bolt and nyloc. Attached fuel lines.
Attached and reinforced Fr & R throttle levers and the interconnect linkage. Used clecos. Don't want to rivet until after cover.
Front throttle lever
Both levers and linkage
Inline view
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Challenger II Long Wing Home
Category
# Logs
# Hours
All
193
693
Avionics
9
19
Controls
4
15
Covering
31
133
Electrical
13
50
Empennage
7
20
Engine
15
43
Fuselage
42
155
Instruments
2
15
Miscellaneous
15
49
None
7
6
Paint
22
96
Wings
26
92
Copyright © 2001-2024 Matronics. All Rights Reserved.