KitLog pro

Powered By Kitlog Pro v2.0

Gregs CH650B Web Site
' style=
Date:  9-27-2009
Number of Hours:  0.50
Manual Reference:  6-B-10
Brief Description:  Part 04 Cabin Floor to Gear Channel

Tonight I fitted the cabin floor to the gear channel. I used the laser aligner to ensure that the floor was correctly aligned with the remainder of the fuselage.

All work was carried out in accordance with the Zenith Aircraft Company Construction Standards 2007, Zenith Aircraft Company Photo Assembly Guide 2008 and the Zenith Aircraft Company Plan Set Serial Number 65-7512.
' style=

Laser Aligner on fuselage

Laser Aligner on fuselage

' style=

Laser line down the centre of the fuselage

Laser line down the centre of the fuselage

' style=

Cabin floor to gear channel attachment

Cabin floor to gear channel attachment

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.