KitLog pro

Powered By Kitlog Pro v2.0

Gregs CH650B Web Site
' style=
Date:  9-5-2009
Number of Hours:  3.25
Manual Reference:  6-B-6
Brief Description:  Part 03 Firewall

This evening I commenced the construction of the Firewall by positioning the lower doubler,the nose leg support and the rear stiffners and then pilot drilling them

All work was carried out in accordance with the Zenith Aircraft Company Construction Standards 2007, Zenith Aircraft Company Photo Assembly Guide 2008 and the Zenith Aircraft Company Plan Set Serial Number 65-7512.
' style=

Bottom Doubler

Bottom Doubler

' style=

Nose Leg Support in Place

Nose Leg Support in Place

' style=

Rear of the firewall

Rear of the firewall

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.