KitLog pro

Powered By Kitlog Pro v2.0

Gregs CH650B Web Site
' style=
Date:  9-3-2009
Number of Hours:  4.00
Manual Reference:  6-B-4
Brief Description:  Part 02 Final Size drilling

Tonight I completed the final size drilling of the lower rear fuselage section

All work was carried out in accordance with the Zenith Aircraft Company Construction Standards 2007, Zenith Aircraft Company Photo Assembly Guide 2008 and the Zenith Aircraft Company Plan Set Serial Number 65-7512.
' style=

Left Side drilled to final size

Left Side drilled to final size

' style=

Both Sides drilled to final size

Both Sides drilled to final size

' style=

Diagonals drilled to final size

Diagonals drilled to final size

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.