KitLog pro

Powered By Kitlog Pro v2.0

Gregs CH650B Web Site
' style=
Date:  5-3-2009
Number of Hours:  3.15
Manual Reference:  6-T-3
Brief Description:  Elevator final size drilling

Drilled the elevator to the correct final size and then stripped the elevator down ready to de-bur.

All work was carried out in accordance with the Zenith Aircraft Company Construction Standards 2007, Zenith Aircraft Company Photo Assembly Guide 2008 and the Zenith Aircraft Company Plan Set Serial Number 65-7512.
' style=

Elevator drilled final size

Elevator drilled final size

' style=

Elevator centre section drilled final size

Elevator centre section drilled final size

' style=

Elevator trim tab drilled final size

Elevator trim tab drilled final size

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.