KitLog pro

Powered By Kitlog Pro v2.0

Gregs CH650B Web Site
' style=
Date:  10-5-2008
Number of Hours:  2.25
Manual Reference:  6-T-1C
Brief Description:  Stabiliser drilled to correct size

Drilled the stabiliser skeleton to the correct size and the removed and de-bured all the stabiliser skeleton components.

All work was carried out in accordance with the Zenith Aircraft Company Construction Standards 2007, Zenith Aircraft Company Photo Assembly Guide 2008 and the Zenith Aircraft Company Plan Set Serial Number 65-7512.
' style=

Skeleton drilled correct size

Skeleton drilled correct size

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.