Drilled hinge location, riveted to door and screwed to reame with not plates, Drilled plexy glass and installed. Installed G228 L & R and riveted in place. Started on "Turtle Deck" locating where the ribs go and drawing lines square from the cabin down the fuselage. Anough for today.