Installed all the gear brackets, installed the right side spindle and wheel assembly, Installed the gear on the plane and put it on the floor, installed the tail wheel, Installed the rudder pedals and brackets(still need to order the missing bolts). Drilled holes and put torque tube in place(missing one support block. Removed side skins so I can install elevator control tube.