KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  11-29-2012
Number of Hours:  7.00
Manual Reference:  G
Brief Description:  Joining the cabin

Drilled all holes for cabin and fuse, laied out holes for the bottom overlapping section and drilled. Drilled holes every 50mm and on the bottom every 32mm as there was already rivets there and I just went inbetween them. De-burred and riveted everything in place and put it back on the table until I locate all the landing gear bolts. I fear they were not shipped.....Found most of the bolts, there was one missing and hopefully Tony will send it.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.