Brief Description: Built table and marked lines as per AF-001,.
Started setting up bulkheads with hold down blocks and angled back as per drawing AF-0016, Drilled out holes on PA 06 as per drawing A-F-013, drilled out fiber blocke(cable guides) to 15/64 , there was only one in the package of ten that was drilled to 15/64 so I thought that I would use that size, Installed stringers and installed A-12-13 that is now one piece