KitLog pro

Powered By Kitlog Pro v2.0

Joe's RV-10 Adventure
< Previous Log Entry          Next Log Entry >
' style=
Date:  9-2-2006
Number of Hours:  4.00
Manual Reference:  9-1, 9-2
Brief Description:  Started Working on Elevator

Today Ellen and I started working on the elevator by separating the ribs then cleco and match drilling the two pieces together with a #30 drill. There are 16 ribs (8 per elevator). We also deburred all the parts associated with the elevators except the skins. Finally, we started clecoing one of the counterweight-ribs (goes on outboard end of each elevator). Got stumped somewhat because the holes do not match up 100%, but this is addressed in the manual. I need to flute the rib some more so that the parts lie flat together. No pictures.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.