KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  1-6-2014
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Finished the Interiour

Finished cuting and glueing the fabric sidewall inserts. and stick boots. I wanted some place to put a note book, pen and smal flashlight, sun glasses ect. so i modified the LHS document holder to accept a ditty bag velcroed to the frame. The bag is a bicycle topbar bag. I also trimed the front pocket higher than the RHS pocket.
' style=

Side wall inserts

Side wall inserts

' style=

RHS built to print

RHS built to print

' style=

LHS with Ditty Bag

LHS with Ditty Bag

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.