KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  4-16-2013
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Finished the Pitot heat instalation

Since the Rotax 912is engine that I am planning to install has two alternators for 46 amps total. There should be enough power for a heated pitot probe. I purchased and installed the Dynon Probe and installed the heater control box on the leading edge rib forward of the fuel tank. The Probe installs on the access door cover just outboard of the rib. There is another door in the bay inboard of the rib, which should provide adequate access for maintance.
' style=

Making up a wire harness

Making up a wire harness

' style=

Pitot heat control box

Pitot heat control box

' style=

back side of control box rib

back side of control box rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.