KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  3-1-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Reinforced the D-1000 EFIS Skyview Cut-out

The Big D-1000 Skyview panel required cutting away the upper frame that supports the instrument panel. I had a friend in the local EAA chapter weld a reinforcement "L" shaped doubler from .025 thick 4130 steel. This was nested in the cut-away part of the frame. I designed the doubler so that it would restore the original axial (EA) and bending (EI) stiffness and strength of the frame.
' style=

welded steel doublers

welded steel doublers

' style=

Installation (RHS)

Installation (RHS)

' style=

Installed (RHS)

Installed (RHS)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.