KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  6-4-2014
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Built rack for avionics

Avionics box locations - Decided on a location for the Engine Monitoring System box and a future ADSB Reciver. I don't have these boxes yet so I made a wood mock-up of each one and also the Skyview transponder. I am going to mount the EMS and ADBS to the radio rack suport struts. I made up the support struts and brackets to hold the boxes, riveted them together and mounted the assembly on the sides ot the radion rack. I made the brackes to off-set the boxes from the radio rack to be sure that there is plenty of cooling air for the avionics.
' style=

Avionics support struts and brackets

Avionics support struts and brackets

' style=

Bracket assembly

Bracket assembly

' style=

EMS mock-up installed on side of radio rack

EMS mock-up installed on side of radio rack

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.