KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  3-15-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Installed MLG fairings

Trimed and installed the MLG leg to body fairings. The locations for the nut-plates are a little tight with existing fasteners and part edges, so carfull lay-out work was required. It went well.
' style=

Edge trim was a little short from Rans

Edge trim was a little short from Rans

' style=

All Ok in the end.

All Ok in the end.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.