KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-4-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Started construction of the rudder frame

Clecoed an drilled out # 40 match drilled holes in rudder spar and ribs to full size. Dissasembled and debured. Wait for warmer wether to prime parts.
' style=

preassembled the rudder frame

preassembled the rudder frame

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.