KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  3-12-2015
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Positioned the Windshield

Positioned the Windshield in preperation for drilling. I used some tabs made from scrap to clamp the windshield in place, so I could see the existing rivet locations that needed to be missed.
' style=

Windshield ready for drilling

Windshield ready for drilling

' style=

Tabs holding the windshield down

Tabs holding the windshield down

' style=

close encounter to some rivet locations

close encounter to some rivet locations

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.