KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  9-27-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Drilling and deburing fuselage bits and pieces

Drilled out the center spar landing gear fittings. The manual says to pin the bolt holes with undersize pins, but the fittings came drilled full size and the upper and lower spar web bolt holes were one full size under size, while the rivet holes were full size. I Clecoed some of the rivet holes and put un=pulled rivets in the others to locate the fitting and drilled the upper and lower holes full size (1/4"). Drilled the rear spar flange, flap reinforcement plates and bearing block gusset. Started deburing parts.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.