KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  8-12-2009
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Riveted frame, started skining

Finished riveting the frame. 13 of the CCPQ stainless steel rivets had their cores fall out during riveting. I had to drill these out and reinstall new rivets, sometimes multiple times.
Preinstalled safety wire for the tab hinge pins and started installing the aft skins.
' style=

frame finished

frame finished

' style=

started installing skins

started installing skins

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.