KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  6-28-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Drilled out the frame to full size.

Drilled Frame out to full size. To keep the frame aligned while drilling where only one fastener holds two parts together, I made two clamp blocks, one with a hole big enough for a cleco to fit through and the other with a hole bigger than the final drill size. The parts are clecoed thru the first clamp block, then a C clamp is applied using the second block over the cleco teeth and tightened. Then the cleco can be removed and the part drilled, while the parts remain clamped tightly together.
' style=

Clamp blocks

Clamp blocks

' style=

Aligned with a cleco and clamped

Aligned with a cleco and clamped

' style=

Drilled

Drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.