KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  5-30-2009
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Started fiting VS Leading Edge skins

Wes came over and helped with opening up the side skin holes to full size. Then I layed out the fastener lines for the leading edge skin. Drilled out the right hand side to #40 and clecoed. Fliped the stabliser over and tried to align the right hand side per instructions using straping tape. Wow hard to align! Started to grind down the nose of the leading edge ribs as required. Still no-go. I'll try again tomorrow.
' style=

Starting to assemble the Leading Edge Skin

Starting to assemble the Leading Edge Skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.