Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
All
5-24-2009
< Previous Log Entry
Next Log Entry >
Date:
5-24-2009
Number of Hours:
8.00
Manual Reference:
Brief Description:
Drilled Vertical Stablizer rear spar
Started drilling stablizer rear spar and skins, Had to use my 90 degree drill attachment for the first time. It workes great, very smooth.
90 degree drill attachment
VS frame clecoed
Open RS holes to full size
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
460
1984
Aft Fuselage
20
138
Aileron
13
71
Assembly
9
9
Builder
1
Canopy
12
37
Center Fuselage
31
165
Controls
9
15
Cowling
16
16
Demo Flight
2
Distractions
2
Electrical
28
156
Empennage
3
2
Engine
7
8
Fiberglass Tip for V
9
68
Flaps
6
44
Flight Test
5
5
Forward Fuselage
27
139
Fuselage
6
11
FWF
33
57
Horiz Stabilator
29
131
Instruments
42
201
Interiour
6
35
Landing Gear
9
31
Paint
10
10
Project
1
Rudder
11
47
Seats
5
65
Shop
4
Tips
7
0
Tools
3
Trim Tab
1
8
Vertical Stablizer
13
75
Wings
80
440
Copyright © 2001-2024 Matronics. All Rights Reserved.