KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  7-30-2018
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Designed, fabricated and installed the landing lig

Fabricated and installed the landing light. Made the bracket from 0.032 6061-T6
' style=

Landing light bracket flat pattern

Landing light bracket flat pattern

' style=

Fabed and installed

Fabed and installed

' style=

interiour view

interiour view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.