KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  8-14-2017
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Started Painting

I am using the Stewart Systems Paint and process.
Preped the control surfaces by washing with EcoClean detergent. Then Etched with EcoEtch with a light scrup with a scotchbrite pad. Rinsed off with water and let dry overnight. Primed with Ecoprime the next day
' style=

Preped and ready

Preped and ready

' style=

Primed

Primed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.