KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  10-5-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fabricated a Fuel Pump Assy Backup Doubler

Fabricated a double,r from scrap left from the wing fuel tank cut-ou,t for the back side of the firewall to support the fuel pump assy on the forward side of the firewall.
' style=

doubler plate

doubler plate

' style=

installed

installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.