KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  4-8-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Stick grip wieing

Started wireing the stick grips. I opend up the hole in the bottom of the stick to 5/16 so that the 7 wires and expandable sheathing will fit thru a rubber grommet in the hole.
' style=

Vacuming the pull string through the stick

Vacuming the pull string through the stick

' style=

wires and sheathing thru the gromet

wires and sheathing thru the gromet

' style=

Soldering the switches

Soldering the switches

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.