KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  12-20-2013
Number of Hours:  20.00
Manual Reference:  
Brief Description:  Designed and scratch built a center panel

The Rotax 912is engine has a requirement for a lot of switches, so I needed more space for them than the subpanel has available. I want the start switches to be center mounted in the airplane so that the start sequence can be performed from either seat. I also want a Keyed switch so that the engine cannot be started without a key, both for security and safety in case a child is playing in the cockpit. I therefore need to design a build a new center panel....this took a lot longer than it should of. I now have a lot more respect for people who design and build airplanes from scratch.
' style=

Mocked up panel in rear started fab

Mocked up panel in rear started fab

' style=

panel coming together, bending jig

panel coming together, bending jig

' style=

Details finished, Latch pin spring at lwr right is from a ball point pen.

Details finished, Latch pin spring at lwr right is from a ball point pen.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.