KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
' style=
Date:  10-1-2013
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Started on subpanel

I must of gone thru 20 iterations for the instrument panel layout. Mocked-up the instrument subpanel in plywood to make sure switches are really where I want them, with rational flow and adaqute clearances. After some final adjustments drilled the subpanel. I used .65 inches between small circuit breakers. .7 inches spacing between the two 30 amp breakers. 1 inch min spacing between switches. I grouped the breakers and switches in logical groups with 1.5 inch spacing between switch groups and 1 inch spacing between circuit breaker groups. I made a minor mistake in learning that switch anti-rotation key-ways are not consistant, some are keyway up and some are down relative to down off positioin.
' style=

Plywood subpanel mock-up

Plywood subpanel mock-up

' style=

can't change my mind any-more

can't change my mind any-more

' style=

Panel coming together

Panel coming together

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.